Elizabeth City Regional Airport
The ramp rehabilitation project at the Elizabeth City Regional Airport includes demolition of the existing asphalt ramp, installation of new storm drain system, full-depth reclamation of asphalt with cement, installation of 9-inch Portland cement concrete pavement, pavement markings, aircraft tie-downs, taxiway edge lighting, ramp lighting and wash down rack.
The project was constructed in three phases so that airport operations were not affected.