Central Load Out Control Center
The Central Load Out Area Control Center includes an 18,800 SF Operations & Maintenance Building, 2,400 SF Assembly Shelter, 11,000 SF of canopies and four guard posts. The maintenance facility services armored vehicles and military equipment storage, all-weather tracked vehicle assembly and wheeled vehicle strategic assembly systems. The maintenance area features two full-service maintenance bays with an indoor bridge crane, scales, automated door access control module (DACM) systems and radiant flooring.
The Central Load Out Control Center received LEED Silver® certification from the US Green Building Council.